TSI provided engineering, procurement, and construction services for the installation of a grassroots compressor station to be located in Izard County, Arkansas. The station will consist of two Aerial JGD/4-1 compressors driven by two 3,250 HP electric motors supplied on skids and packaged by AG Equipment Company. Other major equipment to be installed on site will be gas coolers, filter separator, unit valve skids, compressor building, auxiliary/MCC building, stand-by generator, instrument air system, station control panel, and plant roads. A high voltage substation will be installed by Others as part of this project.