Gas Plant – Weld County, Colorado

Full EPC of Cryo Gas Plant containing truck loading capabilities for Condensate and NGL products. Liquid handling equipment consisted of (10) 30,000 gallon NGL storage tanks, (3) 30,000 Condensate tanks, truck loading pumps, pipeline pumps and LACT skids.

Scroll back and forth over the images to see the engineering drawings transform into the final product.